Theme: Event

Accident Prone

The ship was going up the river to unload
containers full of scooters and tractors;   
rain upland, water level higher than usual.

There is an overpass across the river and
the ship´s bridge and communication mast
collided with it. It took a month to repair
damage to the ship and she was ready to
sail down the river, out to deep sea again.
There had been no rain for a month,
water level was lower than usual.
 
Going under the bridge was a piece of cake,
nervous pilot and anxious captain smiled,
but then the ship shuddered and got stuck in
the mud.

05-Nov-2012

More By  :  Jan Oscar Hansen

Views: 1502     Comments: 0


Name *
Email ID
Comment *
Verification Code*

Can't read? Reload

Please fill the above code for verification.